Sintakote Steel Pipeline Projects - South Australia

Key Notable Projects

Project Name

Principal

Year

Sizes & Joints

Quantity (km)

Morgan WTP Upgrade

SA Water 2018 Pipe Fittings, Various (114 - 1575) 1

Roxby Downs Pipeline 

BHP 2016 648 / RRJ (CAC lined) 44

Darlington Upgrade Project

Dept of Infrastructure 2016
502&762&960&1016&1290 / SSJ&BSJ
6.1 

Olympic Dam GAB Pipeline

BHP 2015 502 / RRJ 3.2

North South Interconnection System Project

SA Water 2011 1016&813&762&610 / SSJ&RRJ 30

Christies Beach Upgrade Project

SA Water 2011 1200 / Plain End 1

Adelaide Desalination Plant

SA Water

2008

1575 / RRJ

12

Torrens System Upgrade Project

SA Water

2007

1829 / BSJ

3.4

 Olympic Dam Uranium Mine Bore Pipeline  BHP   1998 648 / RRJ 115